[1]
2026. Optimization of Operational Risk in Ecuadorian Mining Using FMEA and Weibull Distribution to Reduce Critical Equipment Failures. Journal of Technology Informatics and Engineering. 5, 2 (Aug. 2026), 251–271. DOI:https://doi.org/10.51903/jtie.v5i2.489.