[1]
“Optimization of Operational Risk in Ecuadorian Mining Using FMEA and Weibull Distribution to Reduce Critical Equipment Failures”, JTIE, vol. 5, no. 2, pp. 251–271, Aug. 2026, doi: 10.51903/jtie.v5i2.489.